Error message

Notice: unserialize(): Error at offset 17 of 21 bytes in variable_initialize() (line 1202 of /home/webserver/website/includes/bootstrap.inc).

Ceremony For New Warehouse

  • Posted on: 17 December 2015
  • By: cte

On 8 April 2015 PT. Citra Tubindo Engineering (CTE) had an opening ceremony for their new warehouse which will be used to fabricate the Stinger an ocean pipe lying equipment which hangs off the back of pipe lying ship. CTE under an EPC Contract "Turn Key" has been awarded the Engineering Procurement and Construction including the Commissioning of the New Stringer for the vessel Jascon 18 which is due arrive the KIIE early September 2015 for the final commissioning and installation of the Stinger

Source: Kabil News